Defect Completion Revisit or Warranty Visit
Following the Defects having been carried out, we are sure that you would want those new repairs re-inspected on site, with a developer notification follow up included with addendum to the report.
Select our Warranty period survey to include all of the defects in your home before the 2 year builders warranty expires, the builder has no obligation to repair where defects are not raised within the 2 year defects liability (snagging warranty) period.
This is a time limited purchase and well worth validating repairs carried out to suitable standards with specified materials .
Let us do the hard work, and take away some of those hassles.
Following the Defects having been carried out, we are sure that you would want those new repairs re-inspected on site, with a developer notification follow up included with addendum to the report.
Select our Warranty period survey to include all of the defects in your home before the 2 year builders warranty expires, the builder has no obligation to repair where defects are not raised within the 2 year defects liability (snagging warranty) period.
This is a time limited purchase and well worth validating repairs carried out to suitable standards with specified materials .
Let us do the hard work, and take away some of those hassles.
Following the Defects having been carried out, we are sure that you would want those new repairs re-inspected on site, with a developer notification follow up included with addendum to the report.
Select our Warranty period survey to include all of the defects in your home before the 2 year builders warranty expires, the builder has no obligation to repair where defects are not raised within the 2 year defects liability (snagging warranty) period.
This is a time limited purchase and well worth validating repairs carried out to suitable standards with specified materials .
Let us do the hard work, and take away some of those hassles.